Great work being done on back pitches. All the drainage slits are in and over 50 tonnes of sand for grading and scaling has gone in on top leaving the prep done for seeding.
We've made huge progress on the pitch developments with recent dry weather helping. Most of the heavy lifting and levelling has been completed and top soil is on in parts.